ORDER STATUS

  • 01

    Deposit Recieved

    Received deposit.

    Estimated Date – 6/22/2017

  • 02

    Design

    I’ll propose designs.  You’ll approve.

    Estimated start: 6/22

    Esitmated finish: 6/22

    DONE!

  • 03

    Wood and Materials Selection

    Hand-selecting each piece of hardwood to be used for the project.

    Date Estimate:  6/24

    DONE!

  • 04

    First Cuts

    Cutting hand-selected wood to lengths needed.

    Date Estimate: 6/26

    DONE!

  • 05

    Wood Preparation

    Prepare wood for cuts into strips

    Date Estimate: 6/27

    DONE

  • 06

    First Strip Cuts

    Cut hand-selected wood into strips.

    Date Estimate: 6/28

    DONE

  • 07

    Glue-Up - First boards

    Glue up strips into first board sets.

    Date Estimate: 6/29

    DONE

  • 08

    Strip Cuts Main Board Portion

    Cut Walnut into strips

    Date Estimate: 7/6

    DONE

  • 09

    First cuts for center portion of walnut

    Cut Walnut into strips

    Date Estimate: 7/6

    DONE

  • 10

    Second cuts for center portion of walnut

    Cut Walnut into strips

    Send branding iron proofs to Rachel I.

    Date Estimate: 7/7

    DONE

  • 11

    Third glue up for edge portions of the board

    Edge portions are cut into new strips and glued again.

    Date Estimate: 7/8

    DONE

  • 12

    First glue up for center portions of the board

    Walnut strips are glued into new boards.

    Date Estimate: 7/10

    DONE

  • 13

    Final glue up for edge portions of the board

    Edge strips are cut into strips again and glued up for the final time.

    Date Estimate: 7/11

    DONE

  • 14

    Crosscuts and more Glue Ups

    Middle portions of the board go through final crosscuts, edge portions go through final glue ups.

    Date Estimate: 7/12

    DONE

  • 15

    Final Glue Ups for Center Portions

    Center portions go through final glue up assembly, edge portions go through cross cuts.

    Date Estimate: 7/13

    DONE

  • 16

    Final Assembly and Glue Ups

    All portions of the board go through final glue ups.

    Date Estimate: 7/14

    DONE

  • 17

    Final Board Preparation

    Detail trimming, beveling, sanding, board conditioning

    Date Estimate: 7/15

    DONE

  • 18

    Branding

    Branding, Delivery

    Date Estimate: 7/20 (This is an estimate based on delivery of brands).

    IN PROGRESS